With the use of Ai generated articles from Open Ai, we are focusing on future technology stocks that are publicly traded

Thursday, December 5, 2013

Mason Graphite reports 658% increase in measured and indicated mineral resources to 50 million tonnes, including 6.7 million tonnes grading 32.4% Cg15

(ED Note: Trading halt lifted on this stock)

    --  EXCELLENT PEA RESULTS MAINTAINED: FIRST 22 YEARS OF PRODUCTION
        AT 27.4% Cg AND LOW OPERATING EXPENSES AT $390/TONNE
    --  CONFERENCE CALL WILL BE HELD TODAY AT 2PM EST



Mason Graphite Inc. ("Mason Graphite" or the "Company") (TSX.V: LLG; OTCQX: MGPHF) is pleased to announce significant resource growth in an updated mineral resource estimate for its 100%-owned Lac Guéret graphite project in northeastern Quebec. 
 
Highlights from the updated mineral resource estimate

    --  Measured & Indicated ("M&I") mineral resources increased 658%
        from 7.6 million tonnes ("Mt") to 50 Mt
    --  Inferred mineral resources increased from 2.8 Mt to 11.9 Mt
    --  Overall M&I grade of 15.6% Cg; the main parameters of the
        preliminary economic assessment for the Lac Guéret project (the
        "PEA") are still valid: 22 years of production at 27.4% with a
        low stripping ratio at 0.76:1 and low operating costs at
        $390/tonne
    --  Enlarged mineral resource could lead to optimized pit design
        and improved economics



Large increase in Mineral Resources
The new mineral resource estimate, as calculated by Roche Ltd. Consulting Group ("Roche''), includes assay data from 170 holes (approximately 26,500 metres) drilled in the GC Zone and now totals 50,024,000 tonnes grading 15.6% Cg, including 6,672,000 tonnes grading 32.4% Cg, in the Measured and Indicated categories and 11,861,000 tonnes grading 17.1% Cg, including 2,637,000 tonnes grading 30.5% Cg, in the Inferred category (See Table 1 below). The enlarged mineral resource envelope offers opportunities to further optimize the mine plan and the project's economics as set out in the PEA in the next phase of technical studies. 

"We are very pleased to see the success of our 2012 drilling program materialize in this updated mineral resource estimate", commented Benoît Gascon, President and CEO of Mason Graphite. "We expect the scale of growth of our project to positively impact what is already expected to be an economical project. Results from the Lac Guéret Project continue to reinforce our belief in the world-class potential of this asset."
Table 1 - December 5, 2013 - Updated Mineral Resource Estimate, GC Zone
 ________________________________________________________
|Categories   |            Unit    |    Tonnes|Grade (Cg)|
|_____________|____________________|__________|__________|
|                                                        |
|________________________________________________________|
|             |U1/U2 (5 to 25 % Cg)| 4,052,000|     13.4%|
|             |                    |          |          |
|Measured (M) |U3 (> 25 % Cg)      |   465,000|     33.8%|
|             |____________________|__________|__________|
|             |All units           | 4,517,000|     15.5%|
|_____________|____________________|__________|__________|
|             |U1/U2 (5 to 25 % Cg)|39,300,000|     13.0%|
|             |                    |          |          |
|Indicated (I)|U3 (> 25 % Cg)      | 6,207,000|     32.3%|
|             |____________________|__________|__________|
|             |All units           |45,507,000|     15.6%|
|_____________|____________________|__________|__________|
|             |U1/U2 (5 to 25 % Cg)|43,352,000|     13.0%|
|             |                    |          |          |
|M + I        |U3 (> 25 % Cg)      | 6,672,000|     32.4%|
|             |____________________|__________|__________|
|             |All units           |50,024,000|     15.6%|
|_____________|____________________|__________|__________|
|                                                        |
|________________________________________________________|
|             |U1/U2 (5 to 25 % Cg)| 9,224,000|     13.3%|
|             |                    |          |          |
|Inferred     |U3 (> 25 % Cg)      | 2,637,000|     30.5%|
|             |____________________|__________|__________|
|             |All units           |11,861,000|     17.1%|
|_____________|____________________|__________|__________|



Note:   A cut-off grade of 5% Cg was used for this mineral resource
        estimate.

        See additional notes on mineral resource estimation methodology
        at the end of this news release.




Excellent PEA Results Maintained
On April 22, 2013, Mason Graphite reported positive results in the PEA for the Lac Guéret project, which included 22 years of production at 27.4% Cg considering a strip ratio of 0.76:1 and operating costs of $390 per tonne. This technical study used data from the previous July 2012 mineral resource estimate, which covers only a small portion of the updated mineral resource area (see Figure 1).
The block model that was created for the mineral resource update was provided to Met-Chem Canada Inc. ("Met-Chem''), the firm responsible for the completion of the PEA. Met-Chem was able to verify and confirm that conclusions of the PEA are still relevant and valid for the updated model.
The Company expects the scale and grade of the new mineral resource to positively affect the project economics in the next phase of technical studies.
An updated NI 43-101 technical report outlining the procedures for estimation of the mineral resource estimate presented herein will be filed on SEDAR within 45 days of the date of this press release.
Future Mineral Growth Potential
The new mineral resource estimate is based on drill data from the GC Zone, which represents only one of two mineralized zones identified on the Lac Guéret property to date.
GC Zone A total of 170 holes totalling approximately 26,500 metres have been drilled in this area. The GC Zone has a strike length of approximately 1.2 kilometres and the new mineral resource estimate has almost doubled the width of the deposit to about 600 metres. The mineral envelope remains open in all directions and the company expects further growth with additional drilling.
GR Zone To date, only 18 holes totalling approximately 2,300 metres have been drilled in this zone, which is located less than one kilometre north of the GC Zone. The GR Zone is currently defined on an area spanning about 1 kilometre by 110 metres.
Mineral Resource Estimation Methodology
The Mineral Resource estimation for the GC Zone is based on geological observations and geochemical data modelization involving the following rock subdivisions: Unit 1 is defined by a content of 5-10 % Cg; Unit 2 by 10-25 % Cg; and Unit 3 by 25 % Cg or more. Waste has less than 5 % Cg. Units 1 and 2, appearing similar in texture, have been regrouped during the interpretation. Unit 2 now ranges from 5 to 25 % Cg.
The GC Zone database includes 4 channels sampled trenches (approximately 900 meters) in addition to 170 NQ size diamond core holes drilled prior to December 15(th), 2012 (approximately 26,500 meters) for a total of 18,182 samples.
Resources were classified as Measured, Indicated or Inferred based on information spacing and the confidence to the geological continuity of mineralization in accordance to the CIM guidelines. Only material located within a pit shell generated from an optimized mining scenario run under Whittle software is included in this mineral resources estimate. This scenario is assuming an overall pit slope of 45°, an operating cost of $69.00 US per tonne milled (including mining and milling costs), a 100 % mining recovery, no mining dilution and a conservative selling price of $1,525 US/tonne of concentrate at 93.7 % Cg.
Drill holes cross sections and plan views were interpreted to construct three-dimensional wireframe models using the geochemical analyses and geological descriptive logs with a nominal cut-off of 5% Cg under GEMS software. No capping value was applied to the assays. Assay intervals were composited to 3 meter lengths from the raw Cgr assay values and grades were estimated using ordinary Kriging. Search ellipsoids were defined in a plane that parallels the average bedding trend characterized by an azimuth of 50(o )and a plunge of 40(o). Anisotropy was interpreted in semi variogram and set to 60 meters along the x axis, 40 meters along the y and 50 meters along the z axis. The block model was defined by block size of 3 meters long by 3 meters wide by 3 meters thick, rotated 40 degrees counter clockwise in alignment to the main geological trend over a total of 425 columns, 265 rows and 110 level and covers a strike length of 960 meters to a maximal depth of 253 meters below the highest surface point. The final mineral resources which are located inside the optimised pit reach 205 meters below surface (maximum depth of optimised pit). From unit types, the following densities were assigned to the blocks: U1-U2 (5-25% Cg)= 2.94 g/cm3, U3 (>25% Cg)= 2.88 g/cm3, Waste (0-5% Cg)= 2.92 g/cm3.
The zone remains open in length and at depth.
Conference Call Details
A conference call will be hosted today, December 5, 2013, at 2:00 pm EST, by the senior management of the Company to discuss the new mineral resource estimate.
The dial-in numbers are:
+1 416 340 2216 (Toronto and International) +1 866 223 7781 (North American Toll Free)
There will be a replay of this call, which will last until end of day December 12, 2013. The replay call in numbers are 905-694-9451 (Toronto and International), or 800-408-3053 (North American Toll Free). The conference ID number 2808861 will serve as the password for the replay.
Quality Control and Assurance
Analyses for this drilling campaign were carried out by AGAT Laboratories Ltd. in Mississauga, Ontario, a company independent from Mason Graphite, exercising a thorough Quality Control and Assurance program (QA/QC) with Mason Graphite personnel inserting one blank, two standards and one duplicate every 100 samples. AGAT Laboratories are accredited ISO/IEC 17025 by the Standards Council of Canada (SCC). Carbon as graphite ("Cg") assays reported in this press release were obtained by using the LECO analytical technique ASTM E1915-07A with a detection limit of 0.01% Cg. Drill holes were sampled over an average of 1.5 meter intervals.
Control analyses were performed by Consortium de Recherche Appliquée en Traitement et Transformation des Substances Minérales (''COREM'') of Quebec City.
Qualified Persons
The resource estimate was prepared by Roche, a company independent from Mason Graphite. Edwards Lyons, P.Geo. from Tekhne Research, and Martin Perron from Roche, are independent Qualified Persons as defined by National Instrument 43-101. Mr. Lyons and Mr. Perron have reviewed and approved the technical information pertaining to the mineral resource estimate in this news release.
Mary-Jean Buchanan, Eng. M.Env., of Met-Chem Canada Inc., an independent Qualified Person as defined by National Instrument 43-101, has reviewed and approved the technical information pertaining to the PEA in this news release.
Yves Caron, P. Geo., M.Sc., Director of the Geology and Exploration for Mason Graphite, and Jean L'Heureux, Eng., Mason Graphite's Executive Vice-President of Process Development, both Qualified Persons as defined by National Instrument 43-101, have reviewed and approved the scientific and technical content of this press release.
About Mason Graphite
Mason Graphite is a Canadian mining company focused on the exploration and development of its 100% owned Lac Guéret graphite property, located in northeastern Québec. The property hosts a National Instrument 43-101 compliant Mineral Resource featuring 50,024,000 tonnes grading 15.6% Cg, including 6,672,000 tonnes at 32.4% Cg, in the Measured and Indicated categories and 11,861,000 tonnes at 17.1% Cg, including 2,637,000 tonnes at 30.5% Cg, in the Inferred category. Excellent potential exists for further mineral growth. A Preliminary Economic Assessment study was completed on a historic 7.6Mt mineral resource from July 2012 which features 22 years of production at 27.4% Cg and a pre-tax internal rate of return of 33.7% (see technical report issued by the Company on June 6, 2013). The Company's senior management team possesses significant graphite expertise from their experience at Timcal/Imerys, including Benoit Gascon, CPA, CA, who held executive positions for 20 years, including over 6 years as President and CEO; Jean L'Heureux, Eng., Executive Vice-President, Process Development, with over 20 years of experience; and Luc Veilleux, CPA, CA, Chief Financial Officer and Executive Vice-President, with 8 years of experience. Timcal, now owned by Imerys, is one of the largest graphite producers in the world.
For more information about Mason Graphite, visit www.masongraphite.com or contact info@masongraphite.com.
Stay Connected: Twitter: @MasonGraphite Facebook: /MasonGraphite
Cautionary Statements
This press release contains "forward-looking information" within the meaning of Canadian securities legislation. All information contained herein that is not clearly historical in nature may constitute forward-looking information. Generally, such forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: (i) volatile stock price; (ii) the general global markets and economic conditions; (iii) the possibility of write-downs and impairments; (iv) the risk associated with exploration, development and operations of mineral deposits; (v) the risk associated with establishing title to mineral properties and assets; (vi) the risks associated with entering into joint ventures; (vii) fluctuations in commodity prices; (viii) the risks associated with uninsurable risks arising during the course of exploration, development and production; (ix) competition faced by the resulting issuer in securing experienced personnel and financing; * access to adequate infrastructure to support mining, processing, development and exploration activities; (xi) the risks associated with changes in the mining regulatory regime governing the resulting issuer; (xii) the risks associated with the various environmental regulations the resulting issuer is subject to; (xiii) risks related to regulatory and permitting delays; (xiv) risks related to potential conflicts of interest; (xv) the reliance on key personnel; (xvi) liquidity risks; (xvii) the risk of potential dilution through the issue of common shares; (xviii) the Company does not anticipate declaring dividends in the near term; (xix) the risk of litigation; and (xx) risk management.
Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, no material adverse change in metal prices, exploration and development plans proceeding in accordance with plans and such plans achieving their stated expected outcomes, receipt of required regulatory approvals, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward-looking information. Such forward-looking information has been provided for the purpose of assisting investors in understanding the Company's business, operations and exploration plans and may not be appropriate for other purposes. Accordingly, readers should not place undue reliance on forward-looking information. Forward-looking information is made as of the date of this press release, and the Company does not undertake to update such forward-looking information except in accordance with applicable securities laws.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
The quantity and grade of reported inferred mineral resources in this news release are uncertain in nature and there has been insufficient exploration to define these inferred mineral resources as indicated or measured mineral resources and it is uncertain if further exploration will result in upgrading them to indicated or measured mineral resources.
The PEA is preliminary in nature and includes Inferred Mineral Resources, which are considered too geologically speculative to have mining and economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that the reserves development, production, and economic forecasts on which the PEA is based will be realized.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SOURCE Mason Graphite Inc.
Image with caption: "Figure 1 - GC Zone, Lac Guéret Project. (CNW Group/Mason Graphite Inc.)". Image available at: http://photos.newswire.ca/images/download/20131205_C7936_PHOTO_EN_34529.jpg
To view this news release in HTML formatting, please use the following URL: http://www.newswire.ca/en/releases/archive/December2013/05/c7936.html
SOURCE: Mason Graphite Inc.
For more information about Mason Graphite, visitwww.masongraphite.com or contact:
Investor Relations info@masongraphite.com   Simon Marcotte, Vice-President Corporate
Development +1 (416) 861-5822   Benoît Gascon, President & CEO   Greater
Montreal Office 3030 Le Carrefour blvd. Suite 600 Laval QC H7T 2P5   Toronto Office
65 Queen Street West, Suite 800 Toronto, ON M5H 2M5

Wednesday, December 4, 2013

Sirocco And Canada Lithium Combining To Form Strategic International Competitor In Growth-Oriented Industrial Minerals Sector

Toronto, Canada -- December 4, 2013

Sirocco Mining Inc. ("Sirocco") (TSX: SIM) and Canada Lithium Corp. ("Canada Lithium") (TSX: CLQ) (U.S. OTC: CLQMF) jointly announce that their respective boards of directors have approved, and that they have entered into, a definitive agreement (the "Arrangement Agreement") pursuant to which they will complete a business combination by way of a statutory Plan of Arrangement (the "Arrangement") under the Canada Business Corporations Act. Following the completion of the Arrangement, the current Canada Lithium shareholders will hold approximately 58% of the combined company, while current shareholders of Sirocco will hold approximately 42%.

 Highlights of the Arrangement Include:
 The business combination of Sirocco with its established Aguas Blancas iodine mine in Chile and Canada Lithium with its commissioning-stage lithium project in Quebec will create a significant industrial minerals producer in both the iodine and lithium markets. It is anticipated the combined company will provide significant market and growth synergies and over-all cost reduction. Sirocco's balance sheet and cash flow de-risk the production ramp-up of Canada Lithium's project. In addition, the combined company with its stronger balance sheet will offer greater cash resources. Anticipated ongoing growth in the automotive and electronics sector will continue to drive demand for lithium products, while anticipated increasing applications for X-ray media in Asia will continue to support iodine consumption. This allows for diversification of revenue and market risks.

 In the short to medium term, there is potential for downstream, value-added growth into lithium metal, potassium and sodium nitrates, sodium sulphate and lithium hydroxide. New and continued developments in the lithium battery sector, specifically lithium-iodine technology, which demonstrates higher energy levels and increased battery performance over current lithium battery technologies, may provide the combined company increased market opportunities as uptake of these new battery applications increases.

The combination of Canada Lithium and Sirocco results in only one of two public companies, the other being SQM of Chile, producing both iodine and lithium. Following the closing of the Arrangement, the current Sirocco management team will be appointed as officers of the combined company: Richard P. Clark, as Chief Executive Officer, Alessandro Bitelli, as Chief Financial Officer, Kevin Ross, as Chief Operating Officer and Hugh Stuart, as Vice President of Exploration. This is the core team that contributed to the growth of Red Back Mining's operations, which was acquired by Kinross Gold Corporation for $9.2 billion. Sirocco shareholders will receive 1.175 common shares (on a pre-consolidated basis) in the capital of Canada Lithium for each outstanding Sirocco common share. Pursuant to the transaction, Canada Lithium expects to issue approximately 294 million common shares (on a pre-consolidation and non-diluted basis). The Arrangement values each Sirocco share at C$0.48 representing a premium of approximately 23% to the 20-day volume weighted average price of the Sirocco common shares on the Toronto Stock Exchange as of December 3, 2013. The Arrangement has been approved by the board of directors of both companies. Following the closing of the Arrangement, the board of the combined company will be comprised of nine individuals. Four of the nine will be Canada Lithium nominees, with the remaining five individuals to be nominated by Sirocco. In connection with the Arrangement, Canada Lithium will consolidate its common shares on the basis of one post-consolidation common share for each three existing Canada Lithium common shares. "We're delighted to be joining forces with the Sirocco team. They have an exceptional track record in identifying growth opportunities, establishing sound operations and building wealth for shareholders," said Canada Lithium CEO Peter Secker. Commenting on the transaction, Sirocco CEO Richard Clark said: "We have been looking for growth opportunities in the industrial minerals sector and this combination provides an excellent opportunity for geographic and product diversification while at the same time aligning two products with potential future complementary applications."

At a full annualized production rate, Canada Lithium would produce approximately 20,000 tonnes of battery-grade lithium carbonate, which represents about 12% of the world's output. The commodity, an essential component in lithium-ion batteries, powers the vast and growing field of consumer electronics, electric and hybrid vehicles and grid storage units. Sirocco's iodine operation in Chile will produce approximately 1,400 tonnes of iodine in 2013, with plans to produce 1,000 tonnes in 2014. Upon completion of the installation of a semi-autogenous grinding (SAG) mill, annual capacity will increase to over 2,000 tonnes per annum. Under the Arrangement, as noted above, shareholders of Sirocco will receive 1.175 common shares (on a pre-consolidation basis) in the capital of Canada Lithium for each outstanding Sirocco common share, representing a premium of approximately 23% to the 20-day volume weighted average price of the Sirocco common shares on the Toronto Stock Exchange as of December 3, 2013. The total consideration payable pursuant to the Arrangement values Sirocco's equity at approximately C$120 million. Pursuant to the transaction, Canada Lithium expects to issue approximately 294 million common shares (on a pre-consolidation and non-diluted basis). The transaction will be carried out by way of a court-approved plan of arrangement and will require the approval of at least 66 2/3% of the votes cast by the securityholders of Sirocco at a special meeting of Sirocco shareholders expected to take place in January 2014. It is expected that the transaction will be exempt from the registration requirements of the U.S. Securities Act of 1933, as amended. The transaction is also subject to obtaining the approval of at least a majority of the votes cast by the shareholders of Canada Lithium approving the issuance of the shares in connection with the Arrangement and approval of at least 66 2/3% of the votes cast by the shareholders of Canada Lithium approving the consolidation of the shares of Canada Lithium on 3-for-1 basis, at a special meeting of Canada Lithium shareholders expected to take place the same date as the Sirocco meeting. In addition to securityholder and court approvals, the transaction is subject to applicable regulatory approvals, including the TSX, and the satisfaction of certain other closing conditions as is customary in transactions of this nature. Canada Lithium's financial advisor, Primary Capital Inc. has provided an opinion to the Canada Lithium board of directors that the transaction is fair, from a financial point of view, to Canada Lithium's shareholders (other than Sirocco). The financial advisor for Sirocco, Scotia Capital Inc., has provided an opinion to the Sirocco board of directors that the consideration to be received by the Sirocco shareholders under the transaction is fair, from a financial point of view, to the Sirocco shareholders. Canada Lithium's legal counsel is Cassels Brock & Blackwell LLP and Sirocco's legal counsel is Blake, Cassels & Graydon LLP. Kingsdale Shareholder Services Inc. has been retained as proxy solicitors and information agent. The Arrangement Agreement includes a commitment by each of Sirocco and Canada Lithium not to solicit alternative transactions to the proposed Arrangement. In certain circumstances, if a party terminates the definitive agreement to enter into an agreement to effect a superior proposal that is different from the Arrangement, then such party is obligated to pay to the other party as a termination payment of C$4 million, subject to a right by each party to match a competing superior proposal in question. In connection with the Arrangement Agreement, Sirocco has also agreed to provide a bridge loan of up to $10 million to Canada Lithium. The loan will be due and payable on the earliest of the following: (a) thirty days after the completion of a superior proposal transaction by Canada Lithium or (b) six months following a demand notice from Sirocco. The bridge loan is subject to, among other things, receipt of TSX approval and certain other closing conditions. The loan may be converted, at the option of Sirocco, into common shares of Canada Lithium at a conversion price of $0.399 per common share, at any time after the termination of the Arrangement Agreement. Further information regarding the transaction will be contained in an information circular that each of Canada Lithium and Sirocco will prepare, file and mail in due course to their respective shareholders in connection with the special meetings of each of the Canada Lithium and Sirocco shareholders to be held to consider the transaction. All shareholders are urged to carefully read the information circulars once they become available as they will contain additional important information concerning the transaction. Details regarding these and other terms of the transaction are set out in the Arrangement Agreement, which is available on SEDAR at www.sedar.com. The information agent for the Arrangement is Kingsdale Shareholder Services Inc. ("Kingsdale"). Questions and requests for assistance, including requests for additional information may be directed to Kingsdale at 1-866-581-0510 or by email at: contactus@kingsdaleshareholder.com. About Sirocco Sirocco Mining Inc. is a Canadian company which produces iodine from its Aguas Blancas mine in northern Chile. In addition, Sirocco has exploration interests in West Africa and is actively assessing other opportunities in the resource sector. For more information regarding Sirocco, please refer to Sirocco's public filings available at www.sedar.com and www.siroccomining.com including, in particular, Sirocco's Management's Discussion and Analysis for the year ended December 31, 2012 and its Annual Information Form for the year ended December 31, 2012 and the Management's Discussion and Analysis for the three-month and nine-month periods ended September 30, 2013. About Canada Lithium Canada Lithium holds a 100% interest in the Québec Lithium Project near Val d'Or, the geographical heart of the Québec mining industry. It has completed construction and is in the commissioning phase of an open-pit mine and on-site processing plant with estimated capacity to produce approximately 20,000 tonnes of battery-grade lithium carbonate annually. For more information regarding Canada Lithium, please refer to Canada Lithium's public filings available at www.sedar.com and www.canadalithium.com including, in particular, Canada Lithium's Management's Discussion and Analysis for the year ended December 31, 2012 and its Annual Information Form for the year ended December 31, 2012 and the Management's Discussion and Analysis for the three-month and nine-month periods ended September 30, 2013. Forward-Looking Statements Certain information contained in this news release, including any information relating to the proposed transaction (the "Transaction") and each issuer's future financial or operating performance may be deemed "forward-looking". These statements relate to future events or future performance and reflect each issuer's expectations regarding the Transaction, and the future growth, results of operations, business prospects and opportunities of Sirocco, Canada Lithium and the combined company. These forward-looking statements also reflect each issuer's current internal projections, expectations or beliefs and are based on information currently available to Sirocco or Canada Lithium, respectively. In some cases forward-looking information can be identified by terminology such as "may", "will", "should", "expect", "intend", "plan", "anticipate", "believe", "estimate", "projects", "potential", "scheduled", "forecast", "budget" or the negative of those terms or other comparable terminology. Assumptions upon which such forward looking information regarding completion of the Transaction are based include that Sirocco and Canada Lithium will be able to satisfy the conditions to the Transaction, that the required approvals will be obtained from the shareholders and optionholders of each issuer, as applicable, that all third party regulatory and governmental approvals to the Transaction will be obtained and all other conditions to completion of the Transaction will be satisfied or waived. Although Sirocco and Canada Lithium believe that the forward-looking information contained in this news release is based on reasonable assumptions, readers cannot be assured that actual results will be consistent with such statements. Accordingly, readers are cautioned against placing undue reliance on forward-looking information. Sirocco and Canada Lithium expressly disclaim any intention or obligation to update or revise any forward-looking information, whether as a result of new information, events or otherwise, except in accordance with applicable securities laws. For Further Information, Contact: Sophia Shane Sirocco Mining Inc. Tel: (604) 689-7842 Website: www.siroccomining.com Olav Svela Director, Investor Relations Canada Lithium Corp. Tel: (416) 479-4355 osvela@canadalithium.com

Tuesday, December 3, 2013

Lockheed Martin to use IBC Advanced Alloy in the F-35 Lightning

IBC Advanced Alloys Corp.IBC Advanced Alloys Corp.

TSX VENTURE : IB
OTCQX : IAALF



December 03, 2013 09:00 ET

IBC Engineered Materials Working with Lockheed Martin to Qualify Beralcast® Alloys for F-35 Lightning II Applications


Collaborative work will expand Beralcast® casting applications for F-35 Lightning II and other Lockheed platforms while offering shorter lead times and competitive pricing


WILMINGTON, MASSACHUSETTS--(Marketwired - Dec. 3, 2013) - IBC Advanced Alloys Corp. (OTCQX:IAALF) (TSX VENTURE:IB) ("IBC" or the "Company") reports that its wholly owned US subsidiary, IBC Engineered Materials Corp. ("IB-EMC") is in the final stages of a materials and production qualification process with Lockheed Martin's F-35 Electro-optical Targeting System (EOTS) team based in Orlando, Florida.

IB-EMC is working directly with Lockheed Martin's F-35 EOTS engineering, design and quality teams to develop specific components to demonstrate the technical and commercial viability of the Company's proprietary Beralcast® alloys as effective alternatives to improve lead time and affordability of high performance aerospace components made from beryllium aluminum alloys. As a part of the project IB-EMC has completed several advanced prototype castings which are being used to evaluate Beralcast® alloys and castings for several critical structural and sub- system aerospace components.

The current first phase initiative is to conduct studies of Beralcast® alloys for use on specific optical components on Lockheed Martin's F-35 Lightning II aircraft. This collaboration with Lockheed Martin is also allowing IBC to demonstrate its expertise and industry leadership in offering rapid prototyping and advanced materials solutions to provide investment cast parts to aerospace customers with short lead time and competitive pricing requirements.

"IBC Engineered Materials is excited to be collaborating with Lockheed Martin and believe we will demonstrate the viability of our Beralcast® alloys and cast components as mechanically compliant and cost effective components for the F-35 Lightning II program," said Ray White, President of IB-EMC. "We hope that IBC's partnership and collaboration with Lockheed Martin will advance the potential for our engineered materials products for other aerospace industry initiatives where modulus, weight and cost are important design criteria."

Beralcast® alloys can be used in virtually any high performance application requiring complex, lightweight and high-stiffness parts and can be substituted for aluminum, magnesium, titanium, metal matrix composites as well as pure beryllium or powder metallurgy beryllium-aluminum. Beralcast's® principal alloys are more than three times stiffer than aluminum with 22% less weight and can be precision-cast for simple and complex three-dimensional stability. These high modulus alloys are ideal for high performance industrial and high tech components as well as for a wide range of aerospace applications.

AboutIBC Advanced Alloys Corp.
IBC is an integrated manufacturer and distributor of rare metals (beryllium) based alloys and related products serving a variety of industries including nuclear energy, automotive, telecommunications and a range of industrial applications. IBC has 80 employees and is headquartered in Vancouver, Canada with production facilities in Indiana, Massachusetts, Pennsylvania and Missouri. IBC is creating a dynamic global beryllium and advanced alloys company. IBC's common shares are traded on the TSX Venture Exchange under the symbol "IB" and the OTCQX under the symbol "IAALF".
This news release was prepared by management of IBC, which takes full responsibility for its contents. The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy of this news release. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This disclosure contains certain forward-looking statements that involve substantial known and unknown risks and uncertainties, certain of which are beyond the Company's control including: the impact of general economic conditions in the areas in which the Company operates, industry conditions, changes in laws and regulations including the adoption of new environmental laws and regulations and changes in how they are interpreted and enforced, increased competition, the lack of availability of qualified personnel or management, limited availability of raw materials, fluctuations in commodity prices, foreign exchange or interest rates, stock market volatility and obtaining required approvals of regulatory authorities. In addition there are risks and uncertainties associated with manufacturing activities therefore the Company's future results, performance or achievements could differ materially from those expressed in these forward-looking statements. All statements included in this press release that address activities, events or developments that the Company expects, believes or anticipates will or may occur in the future are forward-looking statements. These statements are based on assumptions made by the Company based on its experience, perception of historical trends, current conditions, expected future developments and other factors it believes are appropriate in the circumstances.

Contact Information

Wednesday, November 20, 2013

Brigus Gold is on a roll into 2015






If you are looking for a growing, junior gold miner, that makes profit, is growing it's margin, and resource base, while reducing overall costs of production, look no further than Brigus Gold.

In Q3 Brigus produced a record 22,000 oz and is on track to exceed 100,000 oz producion per year for the forseeable future.  Resource base has grown to over 2 million oz.

In October drilling at the Black Fox Mine site hit a whopper of a result at 18.09 grams per ton over 39.60 metres, including 39.45 g/t over 10.35 metres. This, in an industry where 3g/t is considered mineable.


That result occured only 2 weeks after hitting a previous whopper of  40.71 gpt Gold Over 26.75

Both if these occured at Brigus's producing Black Fox Mine.  At the same time they began hitting great results at thier Grey Fox property as well.

Although headquartered in Halifax Nova Scotia, Brigus mines are situated in the Timmons Ontario gold district which has been one of the most prolific gold producing regions of the world for decades.  Brigus is an anomaly in the junior gold space. Why? Because it has a working gold mine, it produces gold, is profitable and it is growing.
Brigus Gold Corp  Today - .70c per share
Market Cap$167.8MBeta0.98
Revenue (TTM)$144.1MEPS$0.10
Shares Out.232.1MBook Value$1.05
Dividend Yield0.00%P/E7.4x
Annual Dividend Rate$0.00Price/Sales (TTM)1.2
Ex-Div Date1/1/01P/Cash Flow (TTM)2.7x
Pay Date1/1/01Operating Margin14.79%


If you are in the market for a junior gold miner, you should consider Brigus Gold, before the share price catches fire, because I believe it surely will.

Hope you have great results with your Retirefunds.

HP

Monday, November 18, 2013

Canada Lithium now in Continuous production mode

Canada Lithium Posts Milestone Achievement with First Continuous Lithium Carbonate ProductionTSX: CLQ; U.S. OTC: CLQMF
Canada Lithium Corp. ("Canada Lithium" or the "Company") (TSX: CLQ) (U.S. OTC: CLQMF) is pleased to announce that continuous production of lithium carbonate has been achieved for the first time, as commissioning proceeds through the latter stages at the Company's open-pit mine and processing plant near Val d'Or, Québec. While previous production was achieved in batch-style fashion, all circuits in the process plant, from the crusher through to the final bagging station for lithium carbonate, are operating on a continuous basis.
Day-shift mining operations, temporarily suspended in July, have been reinstated in order to rebuild the ore stockpile depleted over the past quarter. As noted previously, crushing, grinding, concentrator and kiln circuits are operational and will be sequentially stepped-up to design capacity over the coming months. Commissioning of the hydrometallurgical circuit continues to proceed as per the revised timetable, and lithium carbonate product is being packaged on-site.

Throughout the commissioning phase, the Company has continued to monitor working capital levels. Product shipments to Tewoo in China are currently scheduled to commence within the coming weeks. Please log-in to http://www.canadalithium.com/s/PhotoGallery.asp to view the most recent stages of carbonate production.

About Canada Lithium Corp.
The Company holds a 100% interest in the Québec Lithium Project near Val d'Or, the geographical heart of the Québec mining industry. It has completed construction and is in the commissioning phase of an open-pit mine and on-site processing plant with estimated capacity to produce approximately 20,000 tonnes of battery-grade lithium carbonate annually. Metallurgical tests have produced battery-grade lithium carbonate samples. A five-year off-take agreement for a minimum of 12,000 tonnes per year has been signed with Tewoo-ERDC, one of China's larger commodities traders. A second off-take for up to 5,000 tonnes per year has been signed with Marubeni Corp., a major Japanese commodities trading company. Lithium carbonate is used in lithium-ion batteries that power consumer electronics (laptops, tablets, etc.), power-grid storage facilities and electric and hybrid vehicles. For more information regarding the Company, please refer to the Company's public filings available at www.sedar.com and www.canadalithium.com including, in particular, the Company's Management's Discussion and Analysis for the year ended December 31, 2012 and its Annual Information Form for the year ended December 31, 2012 and the Management's Discussion and Analysis for the three-month and six-month periods ended June 30, 2013. The Company trades under the symbol CLQ on the TSX and on the U.S. OTCQX under the symbol CLQMF.
Cautionary Statement Regarding Forward-Looking Information
This press release contains "forward-looking information" within the meaning of Canadian securities legislation. Forward-looking information is based upon the Company's beliefs, estimates and opinions as at the date of this press release, which the Company believes are reasonable, but no assurance can be given that these will prove to be correct. Furthermore, the Company undertakes no obligation to update or revise forward-looking information contained herein if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.
Forward-looking information relates to future events or to future conditions, performance or results of operations and reflects current expectations or beliefs regarding such matters including, but not limited to, information or statements with respect to the use of proceeds, in addition to the following: (i) the amount of mineral resources; (ii) exploration, development and production activities, including information regarding the potential mineralization and resources; (iii) the amount of future output over any period; (iv) net present value and internal rates of return of the mining operation; (v) assumptions relating to capital costs, operating costs and other cost metrics; (vi) assumptions relating to gross revenues, operating cash flow and other revenue metrics; (vii) assumptions relating to future price and demand for lithium and other macroeconomic metrics; (viii) exploration and development plans, including anticipated costs and timing thereof, time frames for completion, and anticipated time to production; (ix) mine potential and expected mine life; and * sources of and anticipated financing requirements.
All information other than matters of historical fact may be forward-looking information. In some cases, forward-looking information can be identified by the use of words such as "seek", "expect", "anticipate", "budget", "plan", "project", "estimate", "assume", "continue", "forecast", "intend", "believe", "predict", "potential", "target", "strategy", "goal", "may", "could", "would", "might", or "will" and similar words or phrases (including negative variations) suggesting future outcomes or statements regarding an outlook.
Forward-looking information is based upon certain assumptions by the Company or its consultants and other important factors that, if untrue, could cause the actual results, performances or achievements of the Company to be materially different from future results, performances or achievements expressed or implied by such information. Such information is based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of lithium, anticipated costs and ability to achieve goals. Certain important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking information include, but are not limited to: (i) required capital investment and estimated workforce requirements; (ii) estimates of net present value and internal rates of return; (iii) future demand and market prices for lithium; (iv) receipt of regulatory approvals on acceptable terms within commonly experienced time frames; (v) anticipated timelines for the commencement of production; (vi) anticipated timelines for community consultations and the impact of those consultations on the regulatory approval process; and (vii) future exploration plans and objectives.
By its nature, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements, or industry results, to differ materially from those expressed or implied by such forward-looking information. Some of the risks and other factors that could cause actual results to differ materially from those expressed in the forward-looking information contained in this press release include, but are not limited to, risks and uncertainties relating to: assumptions regarding the going concern of the Company, the Company's ability to continue to satisfy its interest payment obligations under its outstanding convertible debentures, the ability of the Company to comply with its financial ratio covenants in its debt facility and to better align its debt facility repayment obligations with its revised project schedules, successful and timely commissioning, ramp-up and production at the Québec Lithium Project in accordance with the project's revised schedules, the lack of any further significant capital expenditures during the commissioning stage or to bring the hydrometallurgical process plant into production, timely lithium carbonate delivery of acceptable quality to the Company's off-take partners in accordance with the off-take agreements, the continuing support and cooperation of the Company's off take partners, and the achievement of breakeven cash flow as projected, in addition to the following: (i) the interpretation of drill results, the geology, grade and continuity of mineral deposits and conclusions of economic evaluations; (ii) results of feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations, (iii) the outcome of litigation in which the Company is or may in the future become involved; (iv) risks relating to possible variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined; (v) mining and development risks, including risks related to accidents, equipment breakdowns, labor disputes (including work stoppages and strikes) or other unanticipated difficulties with or interruptions in exploration and development; (vi) risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; (vii) risks related to future commodity demand and price and foreign exchange rate fluctuations; (viii) the uncertainty of profitability based upon the cyclical nature of the industry in which the Company operates; (ix) risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of development or construction activities; * risks related to environmental regulation and liability; (xi) political and regulatory risks associated with mining and exploration; (xii) risks related to the uncertain global economic environment; and (xiii) other risks and uncertainties related to the Company's prospects, properties and business strategy.
Although the Company has attempted to identify important factors that could cause actual results or events to differ materially from those described in the forward-looking information, investors and others are cautioned that this list is not exhaustive and there may be other factors that the Company has not identified. Readers are cautioned not to place undue reliance on forward-looking information contained in this press release. All forward-looking information contained in this press release or incorporated by reference herein is expressly qualified by this cautionary note.
For more information on the risks, uncertainties and assumptions that could cause the Company's actual results to differ from current expectations, please refer to the Company's public filings available at www.sedar.com and www.canadalithium.com including, in particular, the "Risks and Uncertainties section of the Company's Management's Discussion and Analysis and the "Risk Factors" section of the Company's Annual Information Form for the year ended December 31, 2012 .
SOURCE Canada Lithium Corp.
To view this news release in HTML formatting, please use the following URL: http://www.newswire.ca/en/releases/archive/November2013/18/c8250.html
SOURCE: Canada Lithium Corp.
Peter Secker, CEO and Deputy Chairman (416) 361-2821   Olav Svela, Director, Investor
Relations (416) 361-2821 or (416)  479-4355 osvela@canadalithium.com   Laurence A.
Lachance, Renmark Financial Communications Inc. (416)  644-2020
llachance@renmarkfinancial.com   Please visit the Canada Lithium website
atwww.canadalithium.com   You can also follow us on Facebook and Twitter. Corporate
Office: 401 Bay Street, Suite 2010, Box 118, Toronto, ON, M5H  2Y4

Flinders Resources moving ahead with Graphite production schedule

Flinders Resources LimitedFlinders Resources Limited

TSX VENTURE : FDR



November 14, 2013 08:45 ET

Flinders Board Approves Production Plan for the Woxna Graphite Project



VANCOUVER, BRITISH COLUMBIA--(Marketwired - Nov. 14, 2013) - Flinders Resources Limited ("Flinders" or the "Company") (TSX VENTURE:FDR) is pleased to provide an update on its production plan for the Woxna graphite project in Sweden (the "Woxna Project"). If successful the updated plan would permit Flinders to maintain its strategic advantage in becoming the first public company to produce graphite on a commercial scale.

Blair Way, President & CEO states, "After joining the Board and Management, my focus has been to transition Flinders from engineering work to re-establishing production at a capital cost within the Company's means. This would allow us to develop cash flow in the short term and form strong and lasting relationships with customers. We have reviewed all aspects of the recently published Preliminary Economic Assessment on the Woxna Project ("PEA") to define a staged implementation of the PEA. There is no material change to the PEA as it defines the path to production. The implementation plan allows for staged production rates and capital cost spending such that the initial startup requires less than half the total capital cost estimated in the PEA. The balance of the PEA capital cost will be invested in stages as sales and subsequent production levels demand. With more than CDN$11M in cash and zero debt, in combination with expected revenue from graphite sales from mid-2014, we believe the Company is well positioned to incrementally increase to production levels outlined in the PEA. Our aim is to be in production by the end of Q2 2014. With stabilized graphite prices, this is an exciting time for the Company and I look forward to providing regular updates on the progress at site."
The Company advises that it has not based its production decision on a feasibility study of mineral reserves, demonstrating economic and technical viability, and, as a result, there may be an increased uncertainty of achieving any particular level of recovery of minerals or the cost of such recovery, including increased risks associated with developing a commercially mineable deposit. Historically, such projects have a much higher risk of economic and technical failure. There is no guarantee that production will begin as anticipated or at all or that anticipated production costs will be achieved. Failure to commence production would have a material adverse impact on the Company's ability to generate revenue and cash flow to fund operations. Failure to achieve the anticipated production costs would have a material adverse impact on the Company's cash flow and future profitability.
The Company further cautions that the PEA is preliminary in nature. No mining study has been completed. Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that the PEA will be realized.
The fully-permitted and past-producing Woxna Project remains unique in terms of the low startup capital, a high quality coarse graphite flake product and proximity to Europe, one of the world's dominant graphite markets. After the finalization of the PEA in October 2013, and deterioration in the capital markets, the challenge has been to initiate production at a capital cost within the Company's means.
The Flinders Board recently approved the staged production plan for commencing production of graphite from Woxna. This staged plan spreads the PEA capital cost over the next 4 years based as sales contracts are established but permits for lower production levels and costs until the sales warrant capacity expansion.
The open pit mine has been dewatered and is ready to put in service. The front end (grinding) and backend of the plant (drying/sorting/packing) are in serviceable condition, however the middle floatation section requires some additional equipment to enable optimized production according to the improved flow sheet defined in the PEA. Procurement of equipment (new and used) and design work has commenced. The Company currently exceeds all environmental statutory requirements and has established water balance control measures at site that will be upgraded to match the staged production plan to ensure all discharges are within environmental requirements.
The Company believes that the staged production plan will facilitate marketing of its products and allow the Woxna project to re-establish its former position as a key supplier of graphite to Europe. Flinders aims to position itself as the supplier of choice in terms of price, supply security and quality to the European graphite market. The production model being implemented will ensure the Company has developed an adequate customer base before ramping up to larger scale production and that the graphite products consistently meet end user specifications. Through the sale of reprocessed graphite over the last 12 months the Company has made substantial marketing in-roads and is confident the Woxna brand will continue to be well received throughout Europe.
Michael Hudson, FAusIMM, MSEG, MAIG, a director of the Company and a qualified person as defined under NI 43-101, has reviewed the scientific and technical disclosure in this news release.

On behalf of the Board,
Blair Way, President and CEO

Forward-Looking Information
Certain information in this presentation may constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws (collectively, "Forward-Looking Statements"). All statements, other than statements of historical fact that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future are Forward-Looking Statements. Forward-Looking Statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect", and "intend" and statements that an event or result "may", "will", "can", "should", "could", or "might" occur or be achieved and other similar expressions. Forward-Looking Statements are based upon the opinions and expectations of the Company based on information currently available to the Company. Forward-Looking Statements are subject to a number of factors, risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the Forward-Looking Statements including, among other things, the Company has yet to generate a profit from its activities; there can be no guarantee that the estimates of quantities or qualities of minerals disclosed in the Company's public record will be economically recoverable; uncertainties relating to the availability and costs of financing needed in the future; competition with other companies within the mining industry; the success of the Company is largely dependent upon the performance of its directors and officers and the Company's ability to attract and train key personnel; changes in world metal markets and equity markets beyond the Company's control; mineral reserves are, in the large part, estimates and no assurance can be given that the anticipated tonnages and grades will be achieved or that the indicated level of recovery will be realized; production rates and capital and other costs may vary significantly from estimates; the Company's decision to restart production at the Woxna graphite project is based on historical production and the Company's preliminary economic assessment of the project and the Company has no plans to first complete a pre-feasibility or feasibility study on the project, as a result there is an increased risk of technical and economic failure for the Woxna graphite project; unexpected geological conditions; delays in obtaining or failure to obtain necessary permits and approvals from government authorities; all phases of a mining business present environmental and safety risks and hazards and are subject to environmental and safety regulation, and rehabilitation and restitution costs; the Company does not maintain insurance against environmental risks; and management of the Company have experience in mineral exploration but may lack all or some of the necessary technical training and experience to successfully develop and operate a mine.
Although the Company believes that the expectations reflected in the Forward-Looking Statements, and the assumptions on which such Forward-Looking Statements are made, are reasonable, there can be no assurance that such expectations will prove to be correct. Readers are cautioned not to place undue reliance on Forward-Looking Statements, as there can be no assurance that the plans, intentions or expectations upon which the Forward-Looking Statements are based will occur. Forward-Looking Statements herein are made as at the date hereof, and unless otherwise required by law, the Company does not intend, or assume any obligation, to update these Forward-Looking Statements.
Cautionary Note to United States Readers Concerning Resource and Reserve Estimates:
This release has been prepared in accordance with the requirements of the securities laws in effect in Canada which differ in certain material respects from the disclosure requirements of United States securities laws.
The terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are Canadian mining terms as defined in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum's (the "CIM") - CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM. These terms are not defined terms under the United States Securities and Exchange Commission (the "SEC") Industry Guide 7 ("SEC Industry Guide 7") under the Securities Act of 1933 and normally are not permitted to be used in reports and registration statements filed with the SEC.
Readers are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into "reserves" (as defined in SEC Industry Guide 7). "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of an economic analysis, except a preliminary economic assessment provided certain additional disclosure requirements are met. Readers are cautioned not to assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC Industry Guide 7 standards as in place tonnage and grade without reference to unit measures.
Accordingly, information contained in this presentation and any documents incorporated by reference herein containing descriptions of our mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

Contact Information

Thursday, November 14, 2013

Focus Graphite Announces Updated Economic Results of Its 2012 Preliminary Economic Assessment

Focus Graphite Inc.Focus Graphite Inc.

TSX VENTURE : FMS
OTCQX : FCSMF
FRANKFURT : FKC

November  2013


- IRR increases to 36.4% pre-tax and is 28.6% after-tax
- NPV $317 million pre-tax and $185 million after-tax on an 8% discounted cash flow basis
- Operating costs reduced by $367 per ton milled for purification costs to $68 per tonne milled
- Operating costs are now $458 per tonne of concentrate
- $28 million reduction in working capital associated to purification costs


OTTAWA, ONTARIO--(Marketwired - Nov. 7, 2013) - Focus Graphite Inc. ("Focus" or the "Company") (TSX VENTURE:FMS)(OTCQX:FCSMF)(FRANKFURT:FKC) is pleased to announce the results of an updated positive Preliminary Economic Assessment ("PEA") for its Lac Knife Graphite Project ("Lac Knife" or "the Project"). The Lac Knife property is located about 27 kilometers south west of Fermont, Quebec. This update is based on improved metallurgical results of the recent Pilot Plant test campaign using an optimized flotation and polishing circuit conducted at SGS Lakefield and announced on August 21st, 2013.
The increase in concentrate grades and associated economic results were updated in the project cash flow summary and were validated by RPA Inc. in consultation with Soutex Inc. of Quebec City. Inputs updated in the financial model included: final concentrate average grade increase from 92% Ct to 96.6% Ct within the new flake size distribution categories, a reduction in operating cost by $367 per tonne milled, due to the elimination of the need to purify the concentrate by a third party and the associated $27,600,000 in working capital requirements. Pricing is based on "run-of mine" prices, without the value added price used in the original PEA financial model. The original report was filed on October 29th, 2012.
The Lac Knife project has a pre-tax internal rate of return ("IRR") of 36.4% (28.6% after tax) and a pre-tax net present value of $ 316.9 million ($185.3 million after tax) in the base case using a weighted average price of US$1866 per tonne of run-of-mine concentrates. The cost of production is $458 per tonne of concentrate.
Highlights are summarized below:
Pre Tax Value
($ millions)
After Tax Value
($ millions)
Net Present Value
8% discount rate 316.9 185.3
10% discount rate 250.1 143.3
12% discount rate 198.4 110.6
Capital Expenditure including a 25% contingency of $24m 125.95 125.95
Operating cost per tonne milled $67.61 $67.61
Operating cost per tonne ofconcentrate produced $458.20 $458.20
Pre-Tax IRR 36.4% 28.6%
Pre Tax Payback Period 2.4 years 2.8 years
Exchange rate US$1.00 = C$1.00 US$1.00 = C$1.00
Strip Ratio 1.12 1.12
Don Baxter, P.Eng, President and Chief Operating Officer, stated: "The recent Pilot Plant results are key to the potential economic viability of Lac Knife. The results show that all flake concentrate above 200 mesh can be produced at 98% Ct thereby eliminating the need to use third party purification proposed in our original PEA study. Within the graphite community, most operations produce lower-grade fines that are difficult to sell. Lac Knife holds the potential to open new markets to Focus for small flake technology-grade graphite products.
"The updated PEA indicates that Lac Knife shows positive economic potential based on current run of mine prices for markets that are here today," Mr. Baxter said.
Focus CEO Gary Economo said: "With the recent excellent metallurgical results from the Lac Knife Pilot Plant and, with the key variables updated in this announcement, our project has the potential to become one of the lowest-cost producers of graphite in the world. The feasibility study we have just initiated moves us closer to financing, securing off-take agreements, permitting and construction."
In tandem to the feasibility level design for the Lac Knife development, Focus continues its development of value-added products destined for technology markets. These products will include spherical graphite used for Li-ion batteries as well as expanded and micronized and purified graphite for use in powder metallurgy and composite materials. These products for technology-grade graphite applications can sell for prices averaging $10,000 per tonne. Focus' work in this area is ongoing and is showing promising results. Value-added products, their costs and their sale prices, were not included in the PEA update average pricing.
Operational Highlights:
  • Open pit mine life is 20 years, at 300,000 tonnes per year.
  • Life of mine production of 6.0 million tonnes (Mt) of mill feed at a grade of 15.66% graphitic carbon (Cgr), based on the initial Mineral Resource Estimate* disclosed on January 19, 2012
  • Processing includes crushing, grinding, flotation, magnetic separation, thickening and drying of run of mine to produce 44,300 tonnes of concentrate per annum (tpa), a reduction of 2,300 tonnes of concentrate is essentially due to the higher concentrate grade.
  • Sustaining capital average is $996,300 per year
  • Life of mine project production of 880,877 tonnes of concentrate at 96.6% Ct
Sensitivity Analysis Update:
Pre-Tax Sensitivity to Graphite Price
Product specifications $US/t conc NPV @10% NPV @8% IRR
-10% Downside scenario 1,679 $192,115 $247,502 30.9%
Updated Base Case 1,866 $250,112 $316,857 36.4%
+10% Upside scenario 2,053 $308,109 $386,213 41.7%
After-Tax Sensitivity to Graphite Price
Product specifications $US/t conc NPV @10% NPV @8% IRR
-10% Downside scenario 1,679 $109,087 $144,646 24.5%
Updated Base Case 1,866 $143,266 $185,305 28.6%
+10% Upside scenario 2,053 $176,939 $225,431 32.4%
A copy of the PEA report and the October 29th, 2012 PEA announcement are available on Focus Graphite's website www.focusgraphite.com.
The updated PEA pre-tax cash flow model is based on a constant 2012 dollar basis, with no provision for escalation. The prices used in the model do not include any potential of value added products the Company is currently developing.
* Note: This PEA is considered by RPA to meet the requirements of a Preliminary Economic Assessment as defined in Canadian NI 43-101 regulations. The economic analysis contained in the technical report is based, in part, on Inferred Resources, and is preliminary in nature. Inferred Resources are considered too geologically speculative to have mining and economic considerations applied to them and to be categorized as Mineral Reserves. There is no certainty that the reserves development, production, and economic forecasts on which the PEA is based will be realized.
This news release has been reviewed by Don Baxter, P.Eng, President and COO of the Company and a Qualified Person under National Instrument (NI) 43-101 guidelines.
About RPA:
RPA Inc. is a group of technical professionals who have provided advice to the mining industry for nearly 30 years. During this time, RPA has grown into a highly respected organization regarded as the specialty firm of choice for resource and reserve work. RPA provides services to the mining industry at all stages of project development from exploration and resource evaluation through scoping, prefeasibility and feasibility studies, financing, permitting, construction, operation, closure, and rehabilitation. Our portfolio of customers includes clients in banking (both debt and equity) institutional investors, government, major mining companies, exploration and development firms, law firms, individual investors, and private equity ventures.
About SGS Metallurgical Services (Lakefield)
SGS Canada Inc. ("SGS") is recognized as a world leader in the development of concentrator flowsheet design and pilot plant testing programs. SGS' Metallurgical Services division was founded over half a century ago. Its metallurgists, hydro-metallurgists and chemical engineers are experienced in all the major physical and chemical separation processes utilized in the recovery of metals and minerals contained in resource properties around the world.
The technical and economic information relating to the PEA contained in this press release has been reviewed and approved by Marc Lavigne, M.Sc., ing., Senior Mining Engineer for RPA, Pierre Roy, M.Sc., P.Eng., ing., Senior Metallurgist Specialist for Soutex, all independent qualified persons under NI 43-101.
The information pertaining to the metallurgical test program completed by SGS that is presented in this news release has been reviewed and approved by Mr. Oliver Peters, M.Sc., P.Eng, MBA, SGS Canada Inc. Consulting Metallurgist. Mr. Peters has extensive experience in the development of metallurgical processes and has managed the majority of the graphite testing programs conducted at SGS in recent years.
About Focus Graphite
Focus Graphite Inc. is an emerging mid-tier junior mining development company, a technology solutions supplier and a business innovator. Focus is the owner of the Lac Knife graphite deposit located in the Côte-Nord region of northeastern Québec. The Lac Knife project hosts a NI 43-101 compliant Indicated Mineral Resource Estimate* of 4.9 million tons grading 15.8% graphitic carbon (Cgr) as crystalline graphite with an additional Inferred Mineral Resource Estimate* of 3.0 million tons grading 15.6% Cgr of crystalline graphite. Focus' goal is to assume an industry leadership position by becoming a low-cost producer of technology-grade graphite. On October 29th, 2012 the Company released the results of a Preliminary Economic Assessment ("PEA") of the Lac Knife Project which indicated that the project has a very good potential to become a graphite producer. As a technology-oriented enterprise with a view to building long-term, sustainable shareholder value, Focus also invests in the development of graphene applications and patents through Grafoid Inc.
Forward Looking Statements - Disclaimer
This news release contains forward looking information within the meaning of Canadian securities legislation. All information contained herein that is not clearly historical in nature may constitute forward-looking information. Generally, such forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes", or variations of such words or phrases or state that certain actions, events or results "may", "could", "would", "might", or "will be taken", "occur", or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking Information, including but not limited to: (i) volatile stock price; (ii) the general global markets and economic conditions; (iii) the possibility of write-downs and impairments; (iv) the risk associated with exploration, development and operations of mineral deposits; (v) the risk associated with establishing title to mineral properties and assets; (vi) the risks associated with entering into joint ventures; (vii) fluctuations in commodity prices; (viii) the risks associated with uninsurable risks arising during the course of exploration, development and production; (ix) competition faced by the resulting issuer in securing experienced personnel and financing; (x) access to adequate infrastructure to support mining, processing, development and exploration activities; (xi) the risks associated with changes in the mining regulatory regime governing the resulting issuer; (xii) the risks associated with the various environmental regulations the resulting issuer is subject to; (xiii) risks related to regulatory and permitting delays; (xiv) risks related to potential conflicts of interest; (xv) the reliance on key personnel; (xvi) liquidity risks; (xvii) the risk of potential dilution through the issue of common shares; (xviii) the Company does not anticipate declaring dividends in the near term; (xix) the risk of litigation; and (xx) risk management.
Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, no material adverse change in metal prices, exploration and development plans proceeding in accordance with plans and such plans achieving their expected outcomes, receipt of required regulatory approvals, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward-looking information. Such forward-looking information has been provided for the purpose of assisting investors in understanding the Company's business, operations and exploration plans and may not be appropriate for other purposes. Accordingly, readers should not place undue reliance upon forward-looking information. Forward-looking information is made as of the date of this news release, and the Company does not undertake to update such forward-looking information except in accordance with applicable securities laws.

Contact Information


Focus Graphite Inc.
Mr. Don Baxter, P.Eng.
President and Chief Operating Officer
705-789-9706
dbaxter@focusgraphite.com
www.focusgraphite.com