"Patience is a Super Power" - "The Money is in the waiting"
Showing posts with label RDNAF. Show all posts
Showing posts with label RDNAF. Show all posts

Wednesday, June 12, 2013

Rodinia Lithium Provides Processing Update On Progress At Diablillos


Toronto, Canada, June 11, 2013: Rodinia Lithium Inc. (“Rodinia” or the “Company”) (TSX-V: RM) is pleased to provide an update on its small scale pilot pond system at its wholly owned Salar de Diablillos lithium-potash project, located in Salta Province, Argentina.  The small scale pilot pond system, which has been working continuously since February 2012, has been providing on site experience and allowing for several advances in the metallurgical process.  Highlights from the pilot pond system include:
  • Second batch of lithium carbonate produced, increasing purity to 99.79% Li2CO3
  • Additional work completed to improve removal of interfering magnesium and sulphate ions
  • Developed and demonstrated an alternate method to produce caustic soda during the process
  • Use of caustic soda later  in the production process, potentially reducing reagent costs
  • Work continues on site to improve yield, develop separation techniques and reduce raw material costs
William Randall, President & CEO of Rodinia, commented “While we experienced delays due to a variety of factors, including a third straight year of record rainfall during January and February, we are on track to deliver an updated economic study on the project.  Results of additional work conducted on the Salar lead us to believe the updated study will be in line with our previously completed Preliminary Economic Assessment, showing very robust figures with relatively low capital expenditure.  Management believes that the high returns and low capital output of the project are attractive components in the current financial climate.”

During the first quarter of 2013, a second process run on a larger scale was completed, resulting in the production of a second batch of lithium carbonate.  The process employed remains largely the same as the Company’s initial run, but the increased quantity of lithium carbonate produced allowed for a hot water wash to improve the quality of the lithium carbonate.  This additional step in the process resulted in increased lithium carbonate purity of 99.79%.

In addition to completing production of a second batch of lithium carbonate, the Company’s engineering team has been operating the small scale pilot pond system continuously in search of improvements in the process design.  The engineering department has been successful in lowering magnesium and sulphate concentration below levels achieved in previous runs.  Removal of magnesium and sulphate ions to achieve low concentration levels in accordance with the Company’s process design has been successful.

In addition, a significant development has been achieved in the production of caustic soda during the evaporation sequence.  An alternate method was tested on the Salar in an attempt to harvest caustic soda during the regular operation of the evaporation ponds.  The Company remains encouraged that the successful harvesting of caustic soda could result in lowered externally sourced reagent use, which in turn, has the potential to lead to meaningful operating cost savings.

The Company expects to provide further updates of work completed on the Salar de Diablillos over the coming months.
The project is supervised by Bob Cinq-Mars, P. Eng. Mr. Cinq-Mars is considered a Qualified Person, as defined by National Instrument 43‐101 and has reviewed and approved the scientific and technical information contained in this press release. Mr. Cinq-Mars is not independent of the Company.

Rodinia Lithium Inc. is a Canadian mineral exploration and development company with a primary focus on Lithium exploration and development in North and South America.  The Company is also actively exploring the commercialization of a significant Potash co-product that is expected to be recoverable through the lithium harvesting process.

Rodinia’s Salar de Diablillos lithium-brine project in Salta, Argentina, contains a recoverable resource of 2.82 million tonnes lithium carbonate equivalent and 11.27 million tonnes potassium chloride equivalent.  The project contains a recoverable inferred resource of 952,553,000 m3 grading 556 mg/L lithium and 6,206 mg/L potassium. Throughout 2013, Rodinia will focus on continuing to develop the Diablillos project by completing additional drilling and advancing through feasibility study.

The Company also holds 100% mineral rights to approximately 15,000 acres in Nevada’s lithium-rich Clayton Valley in Esmeralda County, and is currently in the process of assessing the size, quality and processing alternatives of this deposit.  The Clayton Valley project is located in the only known lithium-brine bearing salt lake in North America, and looks to represent the only new source for domestic lithium carbonate supply.

Please visit the Company’s web site at www.rodinialithium.com or write us at info@rodinialithium.com
For further information please contact
Aaron Wolfe
Vice-President, Corporate Development
Tel: +1 (416) 309-2696
Cautionary Notes
Except for statements of historical fact contained herein, the information in this press release constitutes “forward-looking information” within the meaning of Canadian securities law. Such forward-looking information may be identified by words such as “plans”, “proposes”, “estimates”, “intends”, “expects”, “believes”, “may”, “will” and include without limitation, statements regarding the anticipated effects of the results and the impact of such results with respect to the pilot pond system, the timing with respect to future results, timing with respect to the completion of an updated economic study; the potential of the Diablillos property; the potential results and timetable for further exploration with respect to the Diablillos property, the timetable with respect to future acquisitions and exploration developments at Clayton Valley and Diablillos, timetable for further exploration, analysis and development, title disputes or claims; and governmental approvals and regulation. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from such statements.  Factors that could cause actual results to differ materially include, among others, metal prices, competition, financing risks, acquisition risks, risks inherent in the mining industry, and regulatory risks. Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking information. Except as otherwise required by applicable securities statutes or regulation, the Company expressly disclaims any intent or obligation to update publicly forward-looking information, whether as a result of new information, future events or otherwise.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
For further information please contact Aaron Wolfe
Investor Cubed Inc. Vice-President, Corporate Development
Investor Relations Tel: +1 (416) 309-2696
Tel: +1 (647) 258-3311